Buildings & Units
Buildings & Units is where a project’s shape is described once: its buildings, the levels in each, the units on each level, and any other areas such as a basement car park or the roof. Other parts of SmarteBuild Commercial then work by building, level and unit instead of by one long typed list.
It is in the menu on the left, under Pre-construction, and works on the project chosen in the left-hand picker. To work on another project, choose it there.
The words used
Section titled “The words used”| Word | Meaning |
|---|---|
| Building | A tower or block. A project can have several |
| Level | A floor of a building. Ground is floor 0, basements are below it |
| Unit | An apartment, shop or office on a level, known by its number |
| Area | Any other place work happens: a car park, plant room, podium, roof. An area can belong to a building, or to the site outside the buildings |
| Unit type | A kind of unit described once, such as a two-bedroom of 85 m². Every unit of that type shares its finishes, upgrades and inspections |
| Location | What a record is put on in other screens: a building, a level, a unit or an area. No location means the whole project |
The screen
Section titled “The screen”The header shows the project’s name and how many buildings, levels, units and unit types it has. Below are two tabs:
- Buildings and levels: each building as a card, its levels from the top floor down, and the units on each level as small buttons showing the unit number and its type’s code.
- Unit types: the list of unit types, with how many units use each.
Who can do what
Section titled “Who can do what”| Permission | Allows |
|---|---|
| Set up buildings, levels and units | Add and change buildings, levels, units and areas |
| Delete buildings, levels and units | Delete them |
| Manage unit types | Add, change and delete unit types |
Without the first, the screen can be read but not changed. Anyone who can open the project can choose its buildings, levels and units in the other screens; these permissions are needed only to change them here.
The quickest way to set up a project
Section titled “The quickest way to set up a project”- Add the unit types.
- Add a building, then all its levels in one step.
- Add the units to all its levels in one step, choosing a unit type.
- Change the few units that differ, one at a time.
Articles
Section titled “Articles”Where it is used
Section titled “Where it is used”Once a project has buildings, these screens let you put a record on a building, level, unit or area, and narrow their lists to one of them:
| Screen | How it uses them |
|---|---|
| Defects | Each defect’s Location. The list can be filtered to a building, level or unit, and grouped by level or by building |
| Quality | A checklist can be put on a building or unit, and the list filtered by one. Inspections are shown building by building |
| Site Diary | Each photo can have a building or unit, and the photos can be filtered by one |
| Documents and RFIs | A file or an RFI can have a building or unit, and both lists can be filtered by one |
| Correspondence, Submittals and Safety | Each record can have a Location, chosen from the project’s buildings |
| Subcontracts | Each line of a subcontract’s schedule, and each subcontract variation, can have a Location |
| Head Contract | Each line of the schedule of values can have a Location, for a contract that breaks the work down by building or level |
| Unit Handover | Each unit is handed over on its own, and the list can be narrowed to a building or level |
| Finishes Schedule | Every unit gets its finishes list from its unit type |
- A location is always optional. Left empty, the record is for the whole project.
- A project with no buildings shows no location field and no filter, so it looks as it always did.
- Choosing a level in a filter also finds everything on its units and areas. Choosing a building finds everything in it.
- Deleting a building, level, unit or area here leaves the records on it alone. They keep its name, marked “(removed)”, and it can no longer be chosen for new records.