Skip to content
Draft for review. Not published.

Show a letter in the subcontractor's portal

A letter or instruction you sent to a subcontractor can also be shown in their portal. They read it there, acknowledge it with their name, and can reply with files. You see who acknowledged it and when.

  • Who can do this: people with Add and edit correspondence, from the Users page or their role on the project. Administrators always can.
  • The item must be Sent, and be on a subcontract. Only that subcontract’s subcontractor sees it.
  1. Open Correspondence and register the item as usual with Register an item, or open an existing sent item and choose the edit button on it.
  2. Set Direction to Sent.
  3. Choose More details and pick the Subcontract, for example “Plasterboard and ceilings, Dryline Interiors”.
  4. Switch on Show in the subcontractor’s portal. The line under it names who can read it.
  5. Choose Register item (or Save when editing).
  • The item shows “In the subcontractor’s portal: Shown to Dryline Interiors; not acknowledged yet”.
  • The subcontractor finds it in their portal under Letters and instructions, marked To acknowledge. When they acknowledge it, your item shows “Acknowledged by” their name and the date.
  • If they reply, the reply appears in the thread as a received item marked From the subcontractor’s portal, and it answers the item: its reply due is met and any late-reply bell is settled. Files they send go into the project’s Documents.
  • Nothing is emailed. The subcontractor sees it next time they open their portal.
  • An acknowledgement is kept once, with the name they typed and the date.
  • Switch it off by editing the item and turning Show in the subcontractor’s portal off; the subcontractor then no longer sees it.