Get a unit ready to hand over

Before a unit can be handed over it is inspected, and every defect on it is fixed. This is how to book and record the pre-handover inspection, close the defects and mark the unit ready.

  • Who can do this: anyone with “Record unit handover”. Administrators always can.
  • To mark a defect fixed from here you also need “Close defects”, the Defects permission.
  • The unit exists in Buildings & Units.
  1. Open Unit Handover, choose the project on the left, and click the unit on the board, for example Unit 501. It shows Not ready and four steps, each “(not yet)”.
  2. Press Book the inspection, choose the day under Inspection on, and press Book. The unit shows Inspection booked, with the day and your name.
  3. After the inspection, press Record the inspection. Choose the day under Inspected on, type a Note if you have one (who was there, anything agreed) and press Record inspection. The unit shows Inspected.
  4. Look at Defects. It lists every defect in the Defects list that is on this unit, open and fixed. Log anything found at the inspection in Defects: Open Defects takes you there.
  5. When a defect has been fixed, press Mark fixed beside it. It shows Fixed.
  6. When no defect is open, press Mark ready to hand over. The unit shows Ready to hand over.
  • Mark ready to hand over is greyed out while a defect is open, with a line saying how many to fix first.
  • A defect shows on the unit when its Building or unit in Defects is this unit, or its Location is the unit’s code (for example “501” or “501 bathroom”). A defect on a level or a building is not any unit’s.
  • Defects are added and changed in Defects only. Mark fixed here marks the same defect fixed there; reopening one is done in Defects.
  • You can Record the inspection without booking it first.
  • After recording it you can Change the inspection or Book a re-inspection; the last inspection’s date and note are kept.
  • Not ready after all takes a ready unit back to Inspected.
  • The board counts only defects on estimates you can open.