Assign people to a project

Put a person, or a whole crew, on a project for a run of weeks, so everyone can see who is where and who is free.

  • Who can do this: “Assign people to projects”, and you must be able to change the project. Administrators always can, on the projects they have access to.
  • The person is on the People list. See Add your people and their tickets.
  1. Open Workforce Planning. The Board tab opens on this week.
  2. Choose Assign, or click Free in a person’s week to start with that person and week.
  3. If you have crews, choose One person or A crew, then choose the Person or Crew.
  4. Choose the Project.
  5. Choose the First week and type how many Weeks. Any day you pick is taken back to that week’s Monday.
  6. Under Their time, choose Full time, or Part of their time and type the percentage.
  7. Check the line under the form, for example “Alex Morgan on Harbour Lane Apartments, full time, for 4 weeks: Mon 7 Dec to Sun 3 Jan 2027”. If anyone would be double-booked, it says so here.
  8. Choose Assign. The Board shows the project in each of those weeks.

To change or remove an assignment, click the project in a week on the Board. Change it and choose Save, or choose Remove.

If a ticket has expired, or runs out before the end of the first week, the window names the person and the ticket.

  • Without “Assign someone whose ticket has expired”, Assign is switched off. Renew the ticket on the People tab, or ask someone who holds that permission.
  • With it, type a Reason and choose Assign. The Board marks the assignment Override, with the reason when you point at it.
  • Double-booking is allowed. The Board marks the week in red with Double-booked and the total.
  • Assigning a crew makes one assignment for each person in it. Change them one by one afterwards.
  • A ticket that runs out after an assignment was made does not remove it. The Board flags those weeks Ticket runs out, then Ticket expired.
  • Someone busy on a project you cannot open shows Another project, with nothing to open.
  • Use With free time or Double-booked above the Board, or choose a trade, to narrow the list.
  • Earlier, This week and Later move the eight weeks shown.
  • Up to 156 weeks can be assigned at once.