Skip to content
Draft for review. Not published.

Lock and print the schedule

When a unit’s finishes are agreed, lock it. A locked unit keeps its list and its price exactly as they are, whatever changes in the items, palettes or prices afterwards. Then print the schedule for the client to sign or for site.

You need the “Lock unit selections” permission.

  1. Open Finishes Schedule and choose Units and clients, then Units.
  2. Tick the units and choose Lock. To lock one unit, open it and choose Lock this unit.
  3. Read the window. If any of the units has an item with nothing chosen, or no sheet, it says so; they are locked as they are.
  4. Choose the button, which reads Lock 12 units.

A unit its client has approved can be locked the same way. Its window then says who approved it and when.

You need the “Unlock unit selections” permission. Nobody has it until an administrator ticks it for them; administrators always can.

Tick the locked units and choose Unlock, or open one and choose Unlock. An unlocked unit follows the items and palettes again: its finishes and price are worked out from today’s palettes, upgrades and prices, which may not be what it was locked with. If its client had approved it, the approval is removed.

  1. On the Units screen, tick the units to print. With none ticked, every unit shown by the filters is printed.
  2. Choose Print.
  3. Choose the Layout:
    • A page for each unit: every item of the unit with what was chosen, and a place to sign.
    • Summary by level: each unit’s palette, upgrades and individual picks, for site and trades.
  4. Choose Print. The schedule opens in a new window ready to print.

To print one unit, open it and choose Print.

  • Lock when the finishes are agreed. Until a unit is locked, a change to a palette, an upgrade or a price changes the unit too.
  • Nobody can change a locked unit’s selections until it is unlocked.
  • A printed unit that is not locked is marked “Not locked: may still change”.
  • If the print window does not open, the browser has blocked it. Allow pop-ups for the site and try again.