Accept or decline a drawing from a consultant
A consultant can upload drawings through an upload link without an account. When one of those drawings has a number already current on the job, it waits for someone here to look at it. Until it is accepted, the current revision stays current, so nobody builds from a drawing the job has not taken on.
Before you start
Section titled “Before you start”- Who can accept or decline: people with the permission Upload and edit documents. Administrators always can.
- The consultant needs an upload link for a folder. Hover the folder in Documents, choose the button “Who can see it, and upload links”, and under Upload links fill in Their name and choose Create link. Copy the link and send it to them, or tick Email the link now.
- Open Documents, with the project chosen in the picker, and choose the Register view. Above the list a strip says, for example, “1 drawing received from a consultant is waiting for you”, with who sent it, when, and what accepting would do.
- Click the drawing’s name to open it and look at it first. A blue banner says “Waiting for you to accept” and that the current revision stays current until this is accepted.
- Choose one:
- Accept: the drawing becomes the current revision and the one it replaces is marked superseded. If it is an older revision than the current one, it is kept as history instead.
- Decline: a window asks Why. Type the reason, for example “Wrong revision, we are working to Rev C”, and choose Decline.
What happens next
Section titled “What happens next”- After you accept, the register shows the drawing at its new revision, and the strip clears.
- A declined drawing is kept, marked “Declined” with your reason, as the record of what was sent. The current revision does not change.
Good to know
Section titled “Good to know”- Only drawings with a number already current on the job wait. Anything else sent through the link goes into the folder as a new document, as before.
- While it waits, it is not in the register, the downloaded set or the printed sheet.
- Putting a waiting or declined drawing on a transmittal or an RFI shows the same warning as a superseded one.
- Once decided, it stays decided: if two people press at once, the second is told it was already decided.
- Your own team’s uploads never wait; they see the upload window instead.