Unit Handover

Unit Handover is for handing over the units of a building one by one at the end of the job: book the pre-handover inspection, close the unit’s defects, go through the handover checklist with the person taking the keys, have them sign, and print the handover certificate. It is made to be used standing in the unit with a phone or tablet.

Open Unit Handover from the menu on the left and choose the project on the left. The page opens on the board: the project’s figures, then every unit grouped by building and level, with its client, its status and its open defects. Click a unit to open it; Back to all units returns to the board.

The units come from Buildings & Units, and the defects come from the Defects list. Nothing here is a second copy of either.

Status Meaning
Not ready Nothing has been done towards handing it over yet
Inspection booked The pre-handover inspection has a date
Inspected The inspection has been recorded, with its date and a note
Ready to hand over It has no open defects and is ready for the person taking it
Handed over Received and signed for. The certificate can be printed

Units, Handed over, Ready to hand over, Blocked by defects (not handed over and with open defects) and Not ready yet. When the project has a head contract with a practical completion date, the board shows it under the project’s name, and a unit handed over on another day says so.

The board can be narrowed by building or level, by status, and with Blocked by defects only. On a phone each unit is one row: unit, open defects, status and client.

When the unit has a client in Finishes Schedule, that client sees a Handover tab in their client portal once a handover step has been taken: where their unit stands, and the certificate to download once it is handed over.

  1. Set up the handover checklist
  2. Get a unit ready to hand over
  3. Hand over a unit
  4. Hand over with a form signed on paper