Skip to content
Draft for review. Not published.

Choose finishes for units

The Units screen is the working screen for the whole project: one row per unit with its client, palette, upgrades, picks, price and status. Set a palette or upgrades on many units in one step, then open a unit to change single items.

  • You need the “Make selections for units” permission.
  • The items and options, the unit type sheets, and any palettes and upgrades are set up. The steps at the top of the page say what is still missing.

Open Finishes Schedule and choose Units and clients, then Units. Above the list, filter by building, level and unit type, and by status: All, Not started, In progress, Approved or Locked. A building, level or type filter appears only when there is more than one to choose from. The count on the right shows how many units match.

  1. Tick the units. The box in the heading ticks every unit shown.
  2. Choose Set palette.
  3. Choose the palette. Standard takes the palette off, so every item goes back to its Standard option.
  4. Read the line underneath: “Sets Light on 12 units.”
  5. Choose Set palette.

Upgrades and individual picks on those units stay as they are.

  1. Tick the units and choose Upgrades.
  2. Choose Add or Take off.
  3. Tick the upgrades. Each shows its price, or “Included”.
  4. Choose the button, which reads Add 2 upgrades or Take off 1 upgrade.
  1. Click the unit’s row. Its window shows where it is, its type, its client if it has one, its price, and its finishes list room by room.
  2. Change its Palette, or tick and untick its Upgrades.
  3. Under Finishes, each line shows the item, its quantity, the chosen option, and where the choice came from: Standard, Palette, Upgrade or Picked. To change one item, choose another option from its list. An option that costs the client extra shows the amount beside its name.
  4. Undo beside a picked line puts it back to what the palette and upgrades give. Undo all (for example Undo all 3 picks) does every line.
  5. Choose Done.

Every change in this window is saved as you make it. There is nothing to save at the end.

Column Meaning
Client The unit’s client, if it has one
Palette The unit’s palette, or Standard if it has none
Upgrades The upgrades it has
Picks How many items were changed by hand
Price inc GST What the client pays: the palette’s price, plus each upgrade’s price, plus the extra price of each option picked on its own. A price set for the unit type replaces the usual one
Extra cost Shown with “See cost and margin”. The cost over Standard, ex GST
Status Not started, In progress, Approved by client or Locked. No sheet means the unit’s type has no sheet; 3 not chosen means three items have no option

With “See cost and margin”, a unit’s window also shows its Margin: the price less GST, less the extra cost.

  • Locked units, and units their client has approved, are left as they are by every change here. The result line tells you how many were left. To change an approved unit, send it back first: see Let clients choose and approve their finishes.
  • A unit with no unit type has no finishes list. Give it a type in Buildings & Units.
  • The header of the screen shows how many units are started, approved by their client and locked, and the total of upgrades inc GST.