Set up palettes and upgrades

A palette is a scheme, such as Light or Dark: it gives a unit an option for every item it covers. An upgrade is a priced extra, such as a stone kitchen: it changes the options on a few items. Both are set up the same way. A project does not need either: on the steps at the top, Skip this step marks this step done without them.

  • You need the “Set up the finishes catalogue” permission.
  • The project has its items and their options. Until it does, the Add buttons cannot be used.
  1. Open Finishes Schedule, choose Set up, then Palettes.
  2. Choose Add a palette.
  3. Type its Name, such as “Light”, and a Description if it helps.
  4. Type a Price, inc GST, only if the client pays extra for this palette. Leave it empty if it is included.
  5. Under What it sets, go down the items room by room and choose the option this palette gives each one. Leave an item on “Not set by this palette” to keep its Standard option.
  6. Read the line at the bottom: “Sets 18 of 20 items. The other 2 keep their Standard option.”
  7. Choose Add palette.
  1. Choose Set up, then Upgrades, then Add an upgrade.
  2. Type its Name, such as “Stone kitchen package”, and its Price, inc GST: what the client pays for a unit.
  3. Under What it changes, choose an option for each item the upgrade changes. Leave the rest on “No change”.
  4. Read the line at the bottom: “Changes 3 items on every unit it is added to, for $4,500.”
  5. Choose Add upgrade.

An upgrade must change at least one item.

Bring in a palette from the Colour Selection library

Section titled “Bring in a palette from the Colour Selection library”

If your company has a palette library in Colour Selection, Bring in a library palette appears on the Palettes screen. Choose the Library palette and then Bring in palette. Each of its items becomes an item here with its product as an option, unless this project already has it. The library itself is not changed.

  • Where an upgrade and the palette both set an item, the upgrade wins. If a unit has two upgrades that set the same item, the one added later wins.
  • A unit has one palette and any number of upgrades.
  • The list shows each one’s Points it sets (or Points it changes), its Price inc GST, and how many Units have it.
  • A unit type can have its own price for a palette or an upgrade, set on its sheet. See Give each unit type its sheet.
  • Deleting a palette sends the units that use it back to Standard. Deleting an upgrade takes it off the units that have it. Locked units keep what they have. The product tells you how many units are affected before you confirm.
  • Prices cannot be negative.