Skip to content
Draft for review. Not published.

Hand over with a form signed on paper

When the person taking the unit would rather sign paper, or there is no screen to hand, print the handover form, have it signed by hand, and add a photo or scan of it to the unit. It then stands for their signature.

  • Who can do this: anyone with “Record unit handover”. Administrators always can.
  • The unit is not handed over yet.
  1. Open Unit Handover, choose the project on the left, and click the unit on the board.
  2. Under Handover form on paper, press Print the form. A one-page form opens: the unit, the checklist with the answers already given and room to write the rest, the defects open now, and signing lines for the person receiving the unit and the person handing it over.
  3. Print it, go through it with the person taking the unit, and have both of you sign.
  4. Back on the unit, press Add the signed form and choose the photo or the PDF. The form is listed with the date and who added it.
  5. For a form of more than one page, press Add another page.
  6. Press Hand over and fill in the window as usual. Signature (optional) says the signed form is on file, so signing on screen is not needed.

The certificate says the unit was signed by hand on the printed handover form, which is kept with the unit’s handover.

  • A form can be removed until the unit is handed over. Remove asks first. After handover it stays with the unit.
  • The signed form is stored with the project’s documents, in a Handover folder.