Download or print the current set
The foreman wants every current structural drawing for Tower A; the certifier wants the drawing register. Both come from the Register, which lists each drawing once, at its current revision.
Before you start
Section titled “Before you start”- Anyone who can open the project’s Documents can list, download and print the set. Changing a number, revision, date, status or discipline in the register needs the permission Upload and edit documents.
- Open Documents from the menu on the left, with the project chosen in the picker, and choose the Register view. It opens on Drawings: only files with a drawing number. Choose All documents to include every current file.
- Narrow the list if you need to: All disciplines (for example Structural), All statuses (for example For Construction), and on a project with buildings, All buildings and units (a level includes its units and areas). Find a number or title searches as you type. The count beside the filters says how many are shown, such as “12 of 48”.
- Choose Download set. One zip downloads with the current revision of every drawing shown, each named like “A-101 Floor Plan Rev C.pdf”, and the register inside as a spreadsheet.
- Choose Print for the register sheet: number, title, revision, revision date, status, discipline and when each was last issued. Print it or save it as a PDF.
- Choose Export for the same list as a spreadsheet.
Good to know
Section titled “Good to know”- Only what is shown is downloaded. Clear the filters to get the whole set.
- A set over 2 GB cannot be downloaded in one go. The button says so; narrow it by discipline or building.
- The cells edit in place: number, revision, revision date, status and discipline save when you leave the cell. Escape puts the old value back.
- Tick rows and choose Issue to send them on a transmittal, with each person’s own link.
- The Rev date column shows the upload date under the cell when no revision date has been entered.