Meetings
Meetings keeps the minutes of site, client, design and safety meetings on a project: who was there, what was said about each numbered item, who has to do what by when, and the minutes as issued. An item that is still open comes back at the next meeting of the same kind under its original number until it is closed.
It is in the menu on the left, and works on the project chosen in the left-hand picker.
The words used
Section titled “The words used”| Word | Meaning |
|---|---|
| Series | One kind of meeting on the project, such as Site meeting or Client meeting, with its own numbering: Site meeting 1, 2, 3 |
| Item | One numbered point in the minutes. The third new item of meeting 2 is 2.03 |
| Open, Closed, Note | An open item has an action and comes back at the next meeting. A closed item is done. A note is for information only and is not carried |
| Carried | An open item brought into the next meeting with its number, action by and due date. What earlier meetings said shows under it |
| Agenda headings | The headings items are grouped under, such as Safety, Programme and Quality |
| Open actions | Every open item on the project, across all series, in one list |
| Issue the minutes | Make the minutes PDF and lock the meeting |
Where a meeting stands
Section titled “Where a meeting stands”| Status | Meaning |
|---|---|
| Planned | Its date is still to come |
| Minutes to issue | The date has been reached and the minutes are not issued |
| Minutes issued | The minutes are made and the meeting is locked |
| Being corrected | Issued minutes reopened to correct, to be issued again as a revision |
Nobody sets these: they follow from the date and from issuing.
Agenda headings
Section titled “Agenda headings”Agenda headings on the Meetings tab holds the company’s list. Every new series starts with a copy of it. Each series can then change its own with the pencil beside its name, without changing the company list. A company with no list is offered six common headings to start from.
Changing the company list needs “Add and edit meetings and minutes” held for the whole company, not through a project role.