Register a reply

When a letter is answered, register the answer against it. The two then read as one thread, and the first item counts as answered on the date of the reply.

  • Who can do this: people with Add and edit correspondence, from the Users page or their role on the project. Administrators always can.
  1. Open Correspondence and click the subject of the item being answered. Its thread opens.
  2. On that item, choose Register a reply. The form opens titled “Register a reply”, saying which item it answers.
  3. Check the Direction. It starts as the opposite of the item: a reply to a received letter starts as sent.
  4. Change the Subject if you need to, enter the Date on the reply, and add the files.
  5. If the reply itself needs an answer, enter its Reply due.
  6. Choose Register reply. It gets its own number and appears in the thread under the item it answers.
  • The item answered shows “Answered” with the reply’s date, and leaves Awaiting a reply.
  • The Responsible person’s late-reply bell is settled.
  • A reply starts with the same subcontract and location as the item it answers.
  • A reply can be replied to, so a long exchange stays one thread.
  • If the answer never came on paper you register, edit the item and fill in Replied on under More details. It is only offered while the item has no reply on the register.
  • Deleting a reply puts the item back to awaiting a reply.