Add units to a building
Add the units to every level of a building in one step, numbered for you. Then change the few that are different.
Before you start
Section titled “Before you start”- You need the “Set up buildings, levels and units” permission.
- The building has its levels. If it has none, the form tells you to add them first.
- It helps to have the unit types set up, so the units can be given a type as they are added. See Set up unit types.
Add units to several levels
Section titled “Add units to several levels”- On the building’s card, choose Add units.
- Under On these levels, tick the levels to fill. The levels above ground that have no units yet are ticked for you. All and None tick or clear the lot.
- Type the number of Units on each level.
- Choose a Unit type if all these units are the same type. You can leave it as “No type” and set it later.
- Choose the Numbering:
- By level: 501, 502 puts the level first, so Level 5 has 501, 502, 503. Ground floor units are G01, G02 and Basement 1 units are B101, B102.
- Straight through: 1, 2, 3 numbers the units one after another from the lowest ticked level up.
- Read the line underneath. It shows how many units will be added and a sample of their numbers.
- Choose the button, which now reads Add 48 units or however many there are.
More numbering options
Section titled “More numbering options”Choose More options to set:
- Start at: the first unit on each level (by level), or the first unit number (straight through). Start at 3 by level gives 503, 504.
- Prefix: letters that go before every number. Prefix “A” gives A501, A502.
Add one unit
Section titled “Add one unit”Choose the plus beside a level. Type the Unit number; the Name, Unit type and Area are optional. A unit with no name is called “Unit” and its number, such as Unit 501.
Change or delete a unit
Section titled “Change or delete a unit”Click the unit’s button on its level. Change its number, name, type or area and choose Save. Delete is at the bottom left of the same window, for people with the “Delete buildings, levels and units” permission.
Good to know
Section titled “Good to know”- A unit number can be used only once on a project. If a number is already used, that unit is skipped, and you are told how many were skipped. Use a prefix when two buildings would otherwise share numbers.
- At most 99 units on a level in one go. The box says so when you reach it.
- An area that cannot be right is refused, with the reason under the box: nothing, or a negative figure, or more than 100,000 m² for a unit. Leave the area empty if it is not known.
- Levels that mix types are quickest done in two passes: add them all as the commonest type, then change the others one at a time.
- Hover over a unit’s button to see its name, type and area.
- The units are what defects, inspections, handover and finishes are put on in other screens. See Where it is used.