Set up the handover checklist

The handover checklist is what goes with every unit on the project: keys, remotes, meter readings, manuals and warranties. Each project has its own list. A new project starts with seven items; change them before the first unit is handed over.

  • Who can do this: anyone with “Record unit handover”. Administrators always can.
  1. Open Unit Handover and choose the project on the left.
  2. Press Handover checklist on the board, or Change the items on any unit. The window Handover checklist for the project opens.
  3. To add an item, type it in the box Add an item, for example Letterbox key, choose Tick or Meter reading, and press Add.
  4. To rename an item, type over its name.
  5. To change what kind it is, choose Tick or Meter reading beside it. A meter reading item asks for the reading when it is marked done.
  6. Use Move up and Move down to change the order, and Remove to take one off. Remove asks first.
  7. To use another project’s list, choose it under Copy items from another project and press Copy items. Its items this project does not have yet are added after this project’s own.
  8. Press Done.
  • The starting list is Keys handed over, Remote controls, Electricity meter reading, Water meter reading, Gas meter reading, Manuals and warranties provided, and Appliances demonstrated.
  • A unit already handed over keeps its checklist as it was. Renaming or removing an item later does not change it.
  • Copying skips an item with the same name, in any case, so copying twice adds nothing.
  • Only projects of your company that you can open are offered to copy from.