Skip to content
Draft for review. Not published.

Drawings

Drawings live in Documents, with the rest of the job’s files. A file with a drawing number is treated as a drawing: when a new revision arrives it replaces the old one, the old one is marked superseded, and the Register lists the set you build to, one line per drawing at its current revision.

Open Documents from the menu on the left and choose the project in the picker. The views across the top are Files, Register, Transmittals, RFIs and Activity.

Word Meaning
Drawing number The number on the title block, such as A-101. It is read from the file name when you upload, and can be changed on the file’s Details tab
Revision The revision letter or number, such as C or P2. Also read from the file name
Revision date The date on the drawing’s title block. Left blank, the register shows the upload date
Current The latest revision of a drawing. This is the one to build from
Superseded An older revision. It is kept and can still be opened, but it is marked so nobody builds from it
Current set Every drawing at its current revision: what the Register shows when Drawings is chosen
Received from a consultant A drawing uploaded through an upload link, waiting for someone here to accept it before it becomes current

Name the file with its number and revision, for example “A-101 Rev C Floor Plan.pdf”. On upload the number, revision and title are read from the name. A file without a number stays an ordinary document and none of the drawing rules apply to it.

  1. Upload a new revision of a drawing
  2. Download or print the current set
  3. Accept or decline a drawing from a consultant
  • A superseded drawing opens under an amber banner: “Superseded. Rev B is not the current revision; Rev C is. Do not build from it.” with a button to open the current one.
  • Issuing or raising an RFI on a superseded drawing warns you first and offers Use Rev C instead. You can still go ahead, for the record; the warning is kept with what you did.
  • Two current files with one number are flagged in the register as “2 current files with this number”. Open the newer one and use Link to an earlier file on its Details tab so it supersedes the other.
  • Marking up drawings (clouds, notes, measuring) is not offered.