Set up unit types
A unit type describes a kind of unit once, such as a two-bedroom of 85 m². Every unit of that type then shares what is set up for the type, such as its finishes, upgrades and inspections, so a hundred units are described a few times over, not a hundred times.
Before you start
Section titled “Before you start”You need the “Manage unit types” permission.
- Open Buildings & Units and choose the Unit types tab.
- Choose Add a unit type.
- Type its Name, such as “Two bedroom”, and a short Code, such as “2B”. The code is shown on each unit of this type.
- Choose its Use: Residential, Retail, Office or Other.
- Fill in what applies: Bedrooms and Bathrooms (asked only for Residential), Car spaces, Area in m², and Notes such as “Corner unit with balcony”.
- Choose Add unit type.
The list shows each type with its details and how many units use it.
Give units a type
Section titled “Give units a type”- When adding units in bulk, choose the type in the Add units form.
- For one unit, click the unit on the Buildings and levels tab and choose its Unit type.
Change or delete a type
Section titled “Change or delete a type”Use the pencil or the bin at the end of the type’s row.
Good to know
Section titled “Good to know”- Deleting a type does not delete its units. They stay, without a type. The product tells you how many before you confirm.
- A unit with no type has no finishes list in Finishes Schedule, because the list comes from the type’s sheet.
- The name and the code are both needed.
- A figure that cannot be right is refused, with the reason under the boxes: bedrooms and car spaces must be whole numbers, bathrooms whole or half (1.5 for one and a powder room), and an area more than 0 and no more than 100,000 m². Leave a box empty if it is not known.

