Skip to content
Draft for review. Not published.

Set up the items and options

The items and options are everything that can be chosen on this project: the items, room by room, and the options each one can have. Set them up first, because the unit type sheets, palettes and upgrades are all built from them.

  • You need the “Set up the finishes catalogue” permission.
  • To see and type cost rates you also need “See cost and margin”.
  1. Open Finishes Schedule, choose Set up, then Items and options. While the project has no items, the steps at the top offer Add items, which brings you here too.
  2. Choose Add an item.
  3. Type the Room, such as “Kitchen”. Rooms you have already used are offered as you type.
  4. Type the Item: what is chosen here, such as “Benchtop”.
  5. Choose what it is Measured in: Each, Metres or Square metres. This is how its quantity is counted on each unit type’s sheet.
  6. Choose Add item.

Items are listed under their room.

  1. Beside the item, choose Add an option.
  2. Type its Name, such as “20 mm stone, Snow”.
  3. Fill in what you know: Colour, Supplier, Product code. All three are optional.
  4. Type its Cost: the rate ex GST, for each one or per metre or square metre, as the item is measured.
  5. Type its Extra price, inc GST: what the client pays when this option is picked on its own. Leave it empty if it costs them nothing.
  6. Standard for this point: the first option you add to an item is its Standard. To make a later option the Standard instead, switch this on.
  7. Choose Add option.

To change an item or an option, use the pencil beside it; the bin deletes it.

While the project has no items, Copy from another project appears beside Add an item. Choose the Project and then Copy catalogue. It brings in the items, options, palettes and upgrades. Unit type sheets are not copied, because unit types belong to each project.

  • Each item has exactly one Standard. It is what a unit gets when no palette, upgrade or pick says otherwise, and it is what extra cost is measured against.
  • Deleting an option sends the palettes, upgrades and units that use it back to the Standard option. If you delete the Standard itself, the item has nothing chosen until you make another option the Standard.
  • Deleting an item removes it and its options from the palettes, the upgrades and every unit that is not locked.
  • Locked units keep what they had, whatever is deleted or changed.
  • The cost and the extra price cannot be less than nothing: there is no credit for choosing below Standard.
  • An item with no options yet says “No options yet”, and the steps at the top count it until it has one.