Finishes Schedule

Finishes Schedule is colour selection and upgrades for a project with many units. Every unit ends up with one finishes list: for each item where a finish is chosen (the kitchen benchtop, the bathroom floor tile, the carpet), exactly one product.

It is in the menu on the left, under Estimating, and works on the project chosen in the left-hand picker.

Four layers. The later one wins.

  1. Standard: every item has one Standard option. A unit with nothing else set gets the Standard for every item.
  2. Palette: a scheme such as Light or Dark. One click gives the unit an option for every item the palette covers.
  3. Upgrades: priced extras such as a stone kitchen. Each changes a few items, and wins over the palette there.
  4. Individual picks: one item changed by hand for one unit. A pick wins over everything.

So a hundred units are a hundred short lists against one catalogue.

Word Meaning
Item A place where a finish is chosen, inside a room. “Kitchen: Benchtop”. Some screens still call it a point
Option A product that can fill an item: “20 mm stone, Snow”
Standard The option a unit gets for an item when nothing else is chosen. Each item has one
Palette A named scheme that sets an option on many items. A unit has one palette, or none
Upgrade A priced package that changes a few items. A unit can have several
Pick One item changed for one unit
Sheet For a unit type: which items its units have, and how much of each (4.2 m of benchtop, 38 m² of carpet)
Client The purchaser of a unit, who can choose and approve its finishes in their client portal
Lock Fix a unit’s list and price as they stand

The header shows how many units the project has, how many are started, approved by their client and locked, and the total of upgrades inc GST.

Under it, the steps show where the project is: Items and options, Unit type sheets, Palettes and upgrades (which can be skipped), Choose for units and the last step, locking. Until the setup is done they show the next thing to do, with a button that takes you there. Once it is done they fold to one line; Show the steps opens them again.

The screens are in groups. The ones these articles cover:

Group Screen For
Units and clients Units One row per unit. Set palettes, upgrades and clients on many units at once, open one unit to change single items, send back, lock, print
Units and clients Clients Who has which units, how many they have approved, and where their client portal access stands
Set up Items and options The items by room, and the options of each
Set up Unit type sheets The sheet of each unit type
Set up Palettes The schemes
Set up Upgrades The priced packages

On a phone, one Show list holds every screen under its group.

  1. The project’s buildings, units and unit types, in Buildings & Units.
  2. The items and their options.
  3. A sheet for each unit type.
  4. Palettes and upgrades, if the project has them.
  5. Choose finishes for the units, or let each unit’s client choose and approve.
  6. Lock and print.
Permission Allows
Set up the finishes catalogue Items and options, palettes, upgrades and unit type sheets
Make selections for units Set palettes, upgrades and picks on units, put a client on a unit, send a unit back to its client
See cost and margin Cost rates, a unit’s extra cost and its margin
Lock unit selections Lock units
Unlock unit selections Unlock units. Nobody has this until an administrator ticks it for them; administrators always can
Manage client portal access Make and copy clients’ portal links on the Clients tab
  1. Set up the items and options
  2. Give each unit type its sheet
  3. Set up palettes and upgrades
  4. Choose finishes for units
  5. Let clients choose and approve their finishes
  6. Lock and print the schedule
  • The items and options belong to one project. To reuse them, copy them into a new project whose list is still empty.
  • Options have no pictures.