Record an incident
When someone is hurt, nearly hurt, or something is damaged on site, record it the same day. Record only what is known now: the investigation, corrective actions and photos are added on the incident afterwards.
Before you start
Section titled “Before you start”- Who can do this: “Record incidents and observations”. Administrators always can.
- The project needs at least one estimate, because an incident is kept against one. If it has none, the screen says to add an estimate first.
- Choose the project in the left-hand picker and open Safety. The Incidents tab opens.
- Choose Record an incident. The Record an incident window opens.
- When it happened: the date and time. It starts at now; a date in the future is refused beside the field.
- Kind: Injury, Near miss, Property damage or Environmental.
- How serious: Low, Medium, High or Critical.
- For an injury, two switches appear under The injured person:
- A worker was hurt: on to start the workers’ compensation report on the incident.
- The injured person lost time from work: on for a lost-time injury.
- Location: the building, level or unit, if the project has Buildings & Units. Where exactly: a short line such as “By the east hoist”. Both are optional.
- What happened: describe it. This is the one field you must fill in.
- Immediate action: what was done straight away, if anything.
- Under People involved, choose Add a person for each person. Type their name, choose Injured, Involved or Witness, and type who they work for if you know it.
- Switch on This is a notifiable incident only if the regulator must be told. A red note says what saving will do. See Deal with a notifiable incident.
- Choose Record incident. The incident opens with its number, for example INC-004, and the status Reported. The figures at the top of the page change straight away.
What happens next
Section titled “What happens next”- The job’s sign-off people get a notice on the bell that an incident has been reported.
- A notifiable incident also alerts the job’s sign-off people and administrators by bell and email straight away.
Good to know
Section titled “Good to know”- Only “What happened” is required. Everything else can be added or corrected later with Edit details.
- If you close the window after typing something, it asks before throwing it away.
- Pressing Record incident twice records it once. The second press is refused with “This was saved a moment ago”.
- People involved are typed by name, because most are subcontractors’ workers who do not log in.
- An older incident recorded as Hazard or Other keeps that kind. New hazards are recorded as observations.
- Delete takes an incident off the register and its number is not used again. A notifiable incident cannot be deleted. Deleting needs “Delete incidents and observations”.

