Skip to content
Draft for review. Not published.

Deal with a notifiable incident

A death, a serious injury or illness, or a dangerous incident must be reported to the safety regulator straight away, by the fastest means, which is a phone call. SmarteBuild does not lodge anything with the regulator. It shows the right number for the job’s state and keeps the record of who rang, when, and the reference.

A hurt worker must also be reported to the workers’ compensation insurer. The same panel keeps that record.

  • Who can do this: “Record incidents and observations”. Administrators always can.
  • Anyone needing urgent help: call 000 first.
  1. Record the incident with This is a notifiable incident switched on (see Record an incident), or open an existing one, choose Edit details and switch it on.
  2. Open the incident. While the regulator still has to be told, the panel Notifiable incident: what to do now is at the top, in red.
  3. Under 1. Tell the regulator, check State the project is in. The regulator’s name and phone number appear; on a phone, tap the number to ring it.
  4. If the regulator asks for the details, choose Copy the incident details and paste them, or read them out.
  5. After the call, fill in When they were told, Who rang, How, Their reference (ask for it on the call), and if you have them Inspector spoken to and What they said. Choose Record that the regulator was told. The step shows Told with the date.
  6. Under 2. Leave the area as it is, once an inspector arrives or the regulator says it can be cleared, fill in When it was released and Who released it, and choose The area has been released.
  7. If a worker was hurt, under Report it to the workers’ comp insurer, fill in When it was reported and the Insurer’s reference if there is one, and choose Record the report to the insurer. Until then the step shows when the report is due.
  • When the incident is saved as notifiable, the job’s sign-off people and administrators are alerted by bell and email straight away, and are reminded until the call to the regulator is recorded.
  • Once the call is recorded, the panel moves below the incident’s details.
  • A notifiable incident cannot be closed until the call to the regulator is recorded.
  • A notifiable incident cannot be deleted. It is a record that must be kept.
  • Once the regulator has been told, the incident stays notifiable; the switch cannot be turned off.
  • Each record can be corrected later with Change.
  • The workers’ compensation step appears on any injury with A worker was hurt switched on, notifiable or not.
  • If the project’s address has no state, choose it under State the project is in to see the number.