Skip to content
Draft for review. Not published.

Give each unit type its sheet

A sheet says which items a unit type has and how much of each: a two-bedroom has 4.2 m of benchtop and 38 m² of carpet. Every unit of that type shares the sheet. Until a type has a sheet, its units have no finishes list.

  • You need the “Set up the finishes catalogue” permission.
  • The unit types exist. They are set up in Buildings & Units, not here.
  • The project has its items. See Set up the items and options.
  1. Open Finishes Schedule, choose Set up, then Unit type sheets. A type with no sheet is marked No sheet yet; the others show how many of the project’s items they have.
  2. Choose Set up sheet beside the type.
  3. If another type already has a sheet, Start from lets you copy it into the form as a starting point.
  4. Under Items, tick each item this type has. Tick all and Untick all do the lot.
  5. Beside each ticked item, type the quantity, in the measure the item uses. Use 1 where the item is simply there or not.
  6. Read the line at the bottom: “12 items apply to the 24 Two bedroom units.”
  7. Choose Save sheet.

To change a sheet later, choose Edit sheet.

A palette or an upgrade can cost more or less for one unit type: a stone kitchen costs more in a three-bedroom than in a studio. This part of the sheet appears once the project has a palette or an upgrade.

  1. In the sheet, switch on Different prices for this type.
  2. Type a price beside each palette or upgrade that differs. Leave a price empty to use the usual one, which is shown in grey.
  3. Choose Save sheet.

The Own prices column on the list shows how many prices a type has of its own.

  • Only the items on the sheet appear on a unit’s list. A studio with no study has no study carpet to choose.
  • Quantities drive cost, not price. A unit’s extra cost is the quantity on the sheet times the difference between the chosen option’s cost rate and the Standard option’s cost rate.
  • Every ticked item needs a quantity before the sheet can be saved.
  • Changing a sheet changes every unit of that type that is not locked.
  • A sheet is not copied when items and options are copied from another project.