Register a letter, notice or instruction

Put every contractual letter on the register as it arrives or goes out: a notice of delay from Dryline Interiors, a direction from the superintendent, your own instruction to a subcontractor. It gets a number, and if it needs an answer, the date the answer is due.

  • Who can do this: people with Add and edit correspondence, from the Users page or their role on the project. Administrators always can.
  1. Open Correspondence from the menu on the left, with the project chosen in the picker.
  2. Choose Register an item.
  3. Choose the Direction: Received or Sent.
  4. Type the Subject, for example “Notice of delay: wet weather”, and choose the Type.
  5. Enter the Date: the date on the document. For a received item, Received on is the day it arrived.
  6. Fill in who it was From (received) or To (sent). Names typed before are offered as you type.
  7. If an answer is needed, enter Reply due. Responsible then appears: choose who answers it (or, for a sent item, who chases the answer). It starts as you.
  8. Choose More details for the rest, all optional: the other party, the Subcontract and Location it is about, for a sent item the Sent with transmittal, and a Summary of what it says.
  9. Under Files, choose Add files and pick the letter itself, as a PDF or a scan.
  10. Choose Register item. The item gets the next number, such as C-014, and its thread opens.
  • The item is on the register. If a reply is due, it shows under Awaiting a reply until one is registered.
  • Its files are stored in the project’s Documents, in a folder called Correspondence.
  • Numbers are never reused. A deleted item’s number is not given out again.
  • A file already in Documents can be put on the item from its thread with Choose from Documents, instead of uploading it again.
  • A message in the job’s Chat can be logged here: on the message, choose Log in Correspondence. The form opens filled in from the message, titled “Log a chat message”; check it and save. The item links back to the chat.
  • An item with replies cannot be deleted until its replies are deleted.
  • Taking a file off an item leaves it in Documents. A document on a live item cannot be deleted from Documents.