Skip to content
Draft for review. Not published.

Print the ITP register for a trade

The register is the record for one trade: every place it had to be inspected, whether it passed, who did it, who signed and who released each hold point. Print it when the certifier, the client or the trade asks for proof.

  • Anyone who can open Quality and the project can see and print the register.
  1. Open Quality, choose the project on the left, then the ITPs tab.
  2. Press Register.
  3. Choose the trade in the list above the register. The register shows, for each place: State, Started, Completed, Signed and Hold points.
  4. Press Print. Your browser’s print window opens; choose a printer or save as PDF.
  • The heading shows how many have passed out of how many are required, and how many failed.
  • A place inspected more than once says which inspection it is, for example “Inspection 2”. The latest one is shown.
  • A failed inspection that was closed out shows as passed, with “Failed, then closed out” under it.
  • The register is printed from the browser. It is not filed in Documents.