Skip to content
Draft for review. Not published.

Add a submittal

Add a submittal as soon as you know a shop drawing, sample or method statement has to be reviewed, so the register shows what is coming and who is preparing it.

  • Who can do this: “Add and edit submittals” on the Users page, or a project role that carries it. Administrators always can.
  • Choose the project in the left-hand picker.
  1. Open Submittals from the menu on the left.
  2. Choose Add a submittal.
  3. Type the Title, for example “Balustrade glass shop drawings”.
  4. Choose the Type: Shop drawing, Sample, Product data, Method statement or Other.
  5. Fill in Required by if you know when the approved answer is needed on site.
  6. Choose More details to fill in the rest, all optional:
    • Responsible: type a few letters of the subcontractor or supplier who prepares it, for example “Dryline Interiors”, and pick it.
    • Location: a building, level or unit, for example Tower A, Level 5. Leave it as The whole project otherwise. It is asked only on a project with buildings set up.
    • Reviewer: choose Outside party and type a name, or In our team and choose a person. Choose Add another reviewer for more than one; the label becomes Reviewers in turn.
    • Specification section and Notes.
  7. Choose Add a submittal. It opens with the next number, for example S-012, as revision 0, Not sent.
  8. Under Files sent, choose Add files to attach the drawings or data sheets.

The submittal is on the register as open. It shows “With” the responsible subcontractor or supplier, or “Our team” when none is named, until it is sent for review.

  • Numbers are never used twice, even after a submittal is deleted.
  • Files need an estimate on the project. Files are kept in the project’s Documents, in a Submittals folder; a project without an estimate has nowhere to keep them, and the screen says so.
  • The responsible party is chosen from your supplier list. A name that is not in that list cannot be typed in.
  • Reviewers can be changed until the revision is sent, with Edit details or in the Send for review window.
  • At most six reviewers on a revision, and each only once.