Record a supplier's insurance or licence
When a supplier sends a new certificate, record the day it runs out, the cover and the certificate itself. If the supplier was stopped because of it, they are clear as soon as you save.
Before you start
Section titled “Before you start”- Who can do this: anyone with Manage prequalification and compliance documents. Administrators always can.
- Open Compliance, then the This project tab with the project chosen in the left-hand picker. Each supplier ordered from on the project has a row, with a cell for each document. Needs attention shows only the suppliers with something to fix; All shows every one.
- Choose the cell for the supplier and the document, such as Dryline Interiors under Public liability. From the Expiring soon tab, choose Update on the row instead.
- Choose the day it Runs out.
- Type the Cover, such as 20,000,000. If the document has a minimum cover, the field says how much is needed.
- For an insurance, type the Insurer and the Policy number if you have them. They are printed on the subcontract agreement.
- Under Certificate, choose Choose a file and pick the certificate.
- Read the sentence at the bottom, for example “Public liability will be current until 30 Jun 2027.” Then choose Save.
What happens next
Section titled “What happens next”The cell shows the new date. If the supplier was stopped only because of this document, their row now says Clear, and orders and payment to them go ahead.
Good to know
Section titled “Good to know”- If the supplier does not need this document at all, choose Not required in the same window, say why (for example “Supplies materials only, does no work on site”), and choose Mark as not required. They are never stopped for it. Require it again undoes it.
- Certificates sent by a subcontractor through their portal wait at the top of the Compliance page under Sent by suppliers, to be checked. Nothing counts until you choose Accept. Reject asks for a reason, which the supplier sees.
- Insurer and policy number are not asked for a licence.
- A certificate attached here also shows in the supplier’s dates in Suppliers, and the other way round.
- Hover over a document’s cell to see the insurer and policy number.

