Hand over a unit
Go through the checklist with the person taking the keys, have them sign on the screen, and the unit is handed over. The handover certificate can then be printed or sent to them.
Before you start
Section titled “Before you start”- Who can do this: anyone with “Record unit handover”. Administrators always can.
- The unit is Ready to hand over.
- Open Unit Handover, choose the project on the left, and click the unit on the board.
- Under Checklist, answer each item Done or Not applicable, with a note if needed. Each answer is saved when you press it.
- On a meter reading item marked Done, type the reading as the meter shows it, for example 004512, and press Tab or Enter. It is saved once the reading is typed.
- When the heading says “all answered”, press Hand over. The window Hand over the unit opens.
- Handed over on: today, or the head contract’s practical completion when that day has passed. Change it if the handover was on another day.
- Received by: filled in with the unit’s client when Finishes Schedule has one. Otherwise type the name of the person taking the keys.
- Signature: have the person sign in the box with a finger, a pen or the mouse. Clear the signature starts again.
- Press Hand over. The unit shows Handed over, with who received it, the date and the signature.
- Press Certificate (PDF) to open the handover certificate.
What happens next
Section titled “What happens next”The board counts the unit under Handed over. The certificate shows the unit, the date, who received it and their signature, who handed it over, the checklist with readings and notes, and any defects to be completed after handover. If the unit has a client, they can see it and download the certificate in their client portal.
Good to know
Section titled “Good to know”- The signature is required, unless a handover form signed by hand has been added to the unit.
- Checklist items can be left unanswered, but the window warns you and names them. They are printed on the certificate as “Not answered at handover”.
- The date cannot be in the future.
- A unit with open defects cannot be handed over, unless you hold “Hand over a unit with open defects”. Then the window asks why. Those defects stay open in Defects, show as To finish after handover, and print on the certificate.
- After handover the unit’s checklist is read only.
- Undo the handover takes the unit back to Ready to hand over and removes the sign-off and the signature. It needs “Hand over a unit with open defects”, which nobody has until it is ticked for them on the Users page; administrators always can.
- No email or text message is sent by anything in Unit Handover.