Skip to content
Draft for review. Not published.

Upload a new revision of a drawing

When the architect sends Rev D of A-101, upload it and it replaces Rev C. Rev C is kept, marked superseded, so everyone opening it is told to use Rev D.

  • Who can do this: people with the permission Upload and edit documents. Administrators always can.
  • Name each file with its number and revision, for example “A-101 Rev D Floor Plan.pdf”. The number and revision are read from the name.
  1. Open Documents from the menu on the left, with the project chosen in the picker. Stay on the Files view.
  2. Pick any folder and choose Upload, or drag the files from your computer onto the list. You can add several at once.
  3. If any file has a number that is already current on the job, a window opens before anything is uploaded, titled for example “1 drawing is a new revision”. Each drawing has its own line: “A-101 is already here at Rev C. This becomes Rev D and Rev C is marked superseded”. Files with new numbers go into the folder you chose.
  4. Choose Upload as new revision (or Upload as new revisions for several). A message says which revision each one supersedes.
  5. Open the new file. Its header shows Rev D, and the Revisions tab lists every revision of A-101, current first.
  6. On the Details tab, set the Revision date from the title block and save. Left blank, the register shows the upload date.
  • Rev C is marked “Rev C superseded by Rev D” in the file list, and opens under an amber banner with Open Rev D.
  • Rev D goes into the same folder as Rev C, wherever you dropped it, so the drawing’s revisions stay together.
  • Anyone who was issued Rev C on a transmittal or a share link is listed on Rev D, with a button to re-issue it to them.
  • To keep them apart instead, choose Keep as separate files. Nothing is superseded and both stay current; the register then flags the number.
  • An older revision arriving late (Rev B after Rev C) does not replace the current one. It is kept as history, marked superseded straight away.
  • The same revision uploaded again becomes the next copy of that drawing, keeping its revision letter: useful for a corrected re-issue.
  • Superseded files are hidden in the file list. Tick Show old versions to see them.
  • New version, on an open file, does the same for one file without relying on its name.