Set up a building and its levels

Add a building, then all of its levels in one step. A fifteen-level tower takes two numbers.

  • You need the “Set up buildings, levels and units” permission.
  • The project is chosen in the picker on the left.
  1. Open Buildings & Units and stay on the Buildings and levels tab.
  2. Choose Add a building.
  3. Type its Name, such as “Tower A”. The Code is optional: a short form such as “A”.
  4. Choose Add building. The building appears as a card.
  1. On the building’s card, choose Add levels.
  2. Type the number of Levels above ground and the number of Basement levels.
  3. Read the line underneath. It says what will be added, for example “15 levels: Basement 2, Basement 1, Ground, Level 1 to Level 12.”
  4. Choose the button, which now reads Add 15 levels.

Ground is always included. Levels are named Basement 2, Basement 1, Ground, Level 1, Level 2 and so on, and are shown from the top floor down.

Choose Add levels again. The form starts from what the building already has, so to add two floors, raise the number by two. The line underneath says how many are already in the building and stay as they are; only the new ones are added.

Choose the pencil beside a level to change its Name, Code or Floor number. The floor number sets the order of the levels: ground is 0 and basements are negative, so Basement 1 is -1.

  • Add an area on a building’s card adds a place inside that building that is not a unit: a plant room, a lobby, the roof. It appears in the “Whole building” row.
  • Add a site area at the top adds a place outside the buildings: external works, a site car park. These appear in a Site areas card.

An area has a name, and optionally a code and a size in m².

  • Deleting a building or a level removes everything inside it. The product asks first and says so. You need the “Delete buildings, levels and units” permission.
  • Records in other screens keep the name of a building, level or area that is deleted, marked “(removed)”. It can no longer be chosen for new records.
  • At most 150 levels above ground and 20 basement levels. The box says so when you reach the limit.
  • A building’s name and code can be changed with the pencil on its card.