Skip to content
Draft for review. Not published.

Set up what each role may do

Decide once, for the whole company, what a project manager, a site manager or a foreman may do on a job. Everyone given that role on a project then gets the same rights there.

  • You need the “Manage project roles” permission. Administrators always have it. Nobody else has it until it is ticked for them under Users.
  1. Open any project’s Project team screen (the project page, People tab, Project team) and choose Set up roles at the foot. The Project roles screen lists the company’s roles, what each May do (“12 things”, or “Looks, changes nothing” for a read-only role) and who it is Held by.
  2. Choose Edit beside a role, or Add role for a new one.
  3. Role name: what people will see on the team, such as “Services coordinator”.
  4. Switch on Read-only only for a role that should see the project and change nothing. A read-only role has nothing to tick.
  5. Under What this role may do, open a group by its name. Each group is a part of the product, such as Subcontracts or Submittals, and shows how many are ticked: “3 of 5”. Tick what the role may do.
  6. Read the sentence at the bottom. It says what people with this role will be able to do, for example “12 things on their project, on top of what they are allowed under Users”.
  7. Choose Save (or Add role for a new one). The window closes and the list shows the new count.

Open it with Edit and choose Delete role. It asks first. A role that someone holds cannot be deleted: you are told how many people hold it, and to give them another role first.

  • Changing a role changes it on every project for everyone who holds it.
  • Things marked (sensitive) are ones only ever given on purpose, such as releasing retention. None of the starting roles has them.
  • Only what works on a single project is offered. Company-wide settings, such as approval workflows and setting up roles itself, stay under Users.
  • Only parts of the product your company uses are offered.
  • Two roles cannot have the same name.
  • A deleted starting role does not come back.