Print the retention report

For a meeting or the accountant, print the retention report by project and by subcontractor, or take the same figures into Excel.

  • You need the “See the retention register” and “See subcontract values” permissions.
  1. Open Retention Register, then This project for one project, or All projects for every project you can see.

    This project, with Excel and Print at the top right

  2. Choose Print. The report is laid out and your browser’s print window opens. Print it, or save it as a PDF from there.

  3. For a spreadsheet instead, choose Excel. A workbook downloads.

  • The report and the workbook hold the projects shown on the tab you are on.
  • The workbook includes what was kept by you on terminated subcontracts as its own column.