Find the projects at risk

Work in Hand marks a project under way as at risk when its forecast margin is too low, when its margin has fallen, or when nobody has closed a forecast on it for too long. Check the list before a commercial meeting, and ask the project manager about each one.

  • Who can do this: See company work in hand. Administrators always can.
  1. Open Work in Hand from the menu on the left.

  2. Read the line above the table that starts At risk means: it is the company’s rule, in words.

    When a project under way is at risk: margin under the floor, margin fallen since last month, or no forecast closed lately

  3. Press the At risk tile, or switch on At risk only. The table lists only the projects at risk, and the tiles add up only those.

    At risk only: the four projects at risk, with the tiles adding up only those

  4. Hold the pointer over a project’s red At risk mark to see why. On a phone the reason is written on the project’s card.

  5. Click the project’s name to open its Cost Forecast and look at the cost codes behind it.

  6. Press the At risk tile again to see every project.

  • A project is at risk for any one of three reasons: forecast margin under the floor, margin fallen since the month before, or no forecast closed for the number of months the rule allows.
  • A project under way that has never had a month closed in Cost Forecast is at risk until one is.
  • Finished projects are never marked at risk.
  • Group by client puts the projects under their clients, with a total for each.
  • Excel saves the table shown as a file Excel opens; Print prints the tiles and the table on A4 landscape.