File an approved shop drawing as a drawing

Once a shop drawing is approved, the site should build from it. Filing it as a drawing puts a copy in the project’s Documents with its drawing number and revision, so it appears in the drawing register and supersedes the revision before it.

  • Who can do this: “Add and edit submittals” on the project, and “Upload and edit documents” in Documents. Administrators always can.
  • The submittal is a Shop drawing, its current revision is Approved or Approved as noted, and that revision has at least one file.
  1. Open Submittals and click the submittal. A line says the approved shop drawing can go into Documents as a drawing.

  2. Choose File as a drawing.

  3. If the revision has more than one file, choose the File: one of the files sent, or one returned by the reviewer.

  4. Check the Drawing number and Revision. They are read from the file name when it has them; type them as they are on the drawing, for example S-501 and C.

  5. Read the line at the bottom. It says what will happen in Documents, for example “S-501 Rev C is a new drawing on this project”, or “S-501 is already here at Rev B. This becomes Rev C and Rev B is marked superseded”.

    What File in Documents does: a new drawing, or the next revision of a drawing already in Documents

  6. Choose File in Documents.

  • The drawing is in Documents. A new revision goes into the folder of the drawing it replaces; a new drawing goes into the shared Plans folder.
  • The submittal lists it under In Documents, with the revision it came from, who filed it and when. It opens in the document viewer, and is marked Superseded once a later revision replaces it.
  • Approving never files anything by itself. It is offered; you choose.
  • A copy goes into Documents. The submittal keeps its own file.
  • Each approved revision is filed once.
  • Number up to 50 characters, revision up to 20.