Change the at-risk rule

The at-risk rule decides which projects Work in Hand marks in red. Until it is changed, a project under way is at risk when its forecast margin is under 5%, when its margin has fallen at all since the month before, or when no forecast has been closed for 2 months. Set it to the margin your company works to.

  • Who can do this: Change the at-risk rule. Administrators always can. Without it, Change is not shown.
  1. Open Work in Hand from the menu on the left.

  2. Choose Change, at the end of the line that starts At risk means. The At-risk rule window opens.

    The At-risk rule window: Margin floor, Fall allowed, Forecast kept up, and the rule in words

  3. In Margin floor, type the percentage below which a project is at risk, for example 5.

  4. In Fall allowed, type how many dollars the margin may fall in a month before the project is at risk. 0 means any fall.

  5. In Forecast kept up, choose how many months a project may go without a closed forecast.

  6. Read the sentence at the foot of the window: it is the rule in words.

    The three tests of the at-risk rule; any one is enough

  7. Choose Save rule. The table and the At risk tile change straight away.

  • The rule is the same for every project in the company.
  • The margin floor can be from -100 to 100.
  • The rule is not applied to finished projects.